Buildup In Saddle Bar Of Ropeway Tower

Industry Type

Cement

Product Group

Lotherme

OUR SOLUTION
Product

Lotherme -705

Size (mm)

4

Quantity

12-13 Electrodes

Problem

Wear Out in Saddle bar

Dimensions L×D (mm)

100×150

Previous Solution

LH-115

Job Specific Remarks

There were 20 tower and 2Nos Saddle Bar fixed in one tower.

JOB PICTURES
Job Picture Before Repair
Job Picture After Repair
ANALYSIS
Equipment Name

Ropeway

Base Metal

Cast Iron

Wear Factor

Metal to Metal Friction.

Procedure

  • Clean up the surface area against any fatigue material & other surface contamination.

  • NDT was done for a crack free surface.

  • Preheat the job up to 150°C.

  • Deposit/ Build –up using Lotherme 705, 4.00 mm as considering the bonding with base material.

  •  After buildup, we have covered the welding area using lime for slow cooling of deposit material.

  • After cooling, grinding was done for smooth surface requirement.


Further Reading on Case Studies

CEMENT PLANTS

Coal

Buildup In Saddle Bar Of Ropeway Tower

Read Case Study
Choose Any Option To Contact Us
×

Contact Us


Loading