Industry Type
Cement
Product Group
Lotherme
Lotherme 352
3.15
110
4
Lotherme 352
4
140
10
Lotherme 510 N
4
130
22
Lotherme 802
4
220
10
Lotherme 457
4
130
10
Ball Mill
Head
Crack
The shell is 25 years old and due to hitting liners, Rapid force
XUPER 660 NH,NUCLEOTECH 2222 OF EWAC ALLOY
Cast Steel
650×105
1. Down
hand position made the gougng with lot 802 up to 60 mm depth and grove width of
80 mm and grinding also made to removal of weld metals.
2. Outside the mill head pre heated the job up to 130 dig.
3. Rebeaked the lot 352 250 dig for 1 hour
4. Root run with lot 352 3.15 mm with peening the weld metal on hot condition due to further crack should not devolop.
5. Multy layers with lot 352 4mm, lot 457 4mm.final 3 layers with lot 510n.
6. The same proceser followed inside the mill balance 50mm depth and width of 80 mm
7. The ICL has given 48 hours to complite the job. We took as a challenge and we handed over the job with in 44 hours.