Industry Type
Sugar
Product Group
Lotherme
3.15, 4.00
80, 95, 120
4, 15, 6
MMAW
100-150°C
Job Covered With Lime
Lotherme 701, Lotherme 703, Lotherme 704N
Pedestral Joined With Lotherme 701 703 And 704N
Mill House
Pedestral
Broken (Through) At Corner
Impact & Vibration
First Time Job
Cast Iron (G.I.)
1 Ton
1. Cleaned The Base Metal, Contamination, Oil, And Grease. Burned The Base Metal To Remove All The Contamination.
2. Make V-Groove.
3. Preheated Base Metal @100-150Oc.
4. Applied The Buttering Layer Of Lo-701 To Arrest Oil, Grease (Soaked In Base Metal) Coming Out From Base Metal During Welding.
5. Filled The Groove With Lo-703 & Lo-704N.
6. Short Run And Hot Peening Done During Welding To Relieve Stress.
7. After Compeletion Of Job, Pedestral Covered With Lime To Get It Cool Gradually.